arrow ASK THE EXPERT: How To Plan A Slip Construction Build
arrow DID YOU KNOW?
arrow FEATURED PROJECT: Perdue Farms
arrow About WL Port-Land Systems, Inc.
arrow Events Calendar
spacer
Some Thoughts: Yes, Your Vote Counts!
Rich Pongratz spacer
Rich Pongratz

Some of you have already had the opportunity to cast your vote in the primaries while others, including us here in Pennsylvania, will be doing so shortly.

Then, we all get the chance to exercise our right to vote again on November 6 in the general election. The winner of this year’s presidential election probably will receive more than 70 million votes.

So, does my single vote count? Does yours?

Absolutely! 70 million-plus people who cast their single vote in November will decide who leads us in 2013 and beyond.

So please … exercise your right during this primary season and in November.

Your single vote does count.

Your thoughts?
Rich Pongratz
Richard K. Pongratz, Sales Manager
spacer
Ask the Experts
How To Plan A Slip Construction Build
Send your question to our team of experts.
Q"What are the top concerns a project manager needs to be cognizant of in planning for any size slip construction build?"
– L.H.   
spacer
Q Let’s start out with an extremely generalized definition of "slip construction."
 
slip constructionThis type of construction involves the continuous pouring of concrete into a moving form -- the key word being "continuous." Ideally the pour should be non-stop until complete in order to maintain and achieve optimum continuity. With vertical slip construction, the cured concrete exits the bottom of the upward (usually hydraulically jacked) moving or "slipping" form while fresh concrete is placed in a controlled, consistent manner to the top of the form. Steel rebar is placed in a specific manner as well to aid in structural integrity.
 
Ultimately, the resultant structure is one entity without seams and joints that are normal with sectional construction.
 
In the industries that we serve, we typically use the slip-form construction method to develop any or all of the following: receiving buildings, storage silos, mill towers, pelleting annexes, load-out towers, and warehouses, etc. It is possible for other types of constructed buildings to cohabitate with the completed slip-form structure, such as brick, block, tilt-up concrete, metal, or other construction means dependent upon client preference. These usually entail smaller, lower-elevation outposts, such as offices, liquid tank farms, truck wash areas, and employee facilities.
 
Thorough planning prior to any slip is key to ensure project success. There are many components that play critical roles leading up to the execution of the event. In general, we can classify these into four main categories -- materials, equipment, personnel, pre-slip meeting/communication, as follows:

spacer Materials. The supply of materials that are needed on-site prior to slip construction is paramount. As previously mentioned, "continuous" is the theme. Any material deficiencies incurred after slip commencement can potentially result in unwanted costs.

Mix design of concrete alone is a long process. Design strength requirements, aggregate specifications, availability, and weather all play a part in mix development and supply. Other materials that may be considered "off-the-shelf" commodities, in addition to custom fabrications, will have availability challenges that need to be proactively procured. These can include: rebar, fabricated framed openings, embeds, beams, finishing sand/cement, water supply, etc. Project managers will need to work very closely with engineering, suppliers, purchasing, field supervisors, and sub-contractors to guarantee that all materials are accounted for long before the slip begins.
spacer spacer spacer
spacer Equipment. You can have all the material you need on-site tenfold but, without applicable equipment, all of your procurment work is for naught. Equipment supply and availability is a very sensitive process. Slip location in relationship to equipment accessibility may be a challenge. Today’s "instant gratification" society may lead one to believe that any equipment can be obtained 24/7. If that’s what you believe, slip construciton will never be one of your crowning acheivements as a project manager.

However, as the project manager, equipment accountability is your burden. Crane rental -- including backup crane and fuel -- is the heart of the project. Site lighting (remember that "continuous" means the slip continues throughout the night!), generators, pumps, welding equipment, down to what might be thought of as small items such as hammers, shovels, and crowbars will surely enhance production.
spacer spacer spacer
spacer Pre-Slip Meeting/Communication. Usually a week prior to the start of the slip, all involved groups are requested to send a representative to attend a "pre-slip meeting." This meeting is championed by the project manager and/or senior-level management of WL Port-Land Systems, Inc. This typically takes place on-site which is convenient for all to attend. The purpose of the meeting is to discuss and explain expectations during the slip.

Agenda topics include safety, start time and duration, manpower, emergency considerations, communications, electrical supply, permitting, pumps, cranes, lighting, rebar, concrete (including quantity and supply frequency, quality, truck routing, backup, clean out, and ticketing), concrete testing, and anticipated weather. We encourage open conversation during the meeting to ensure that all areas are addressed.
spacer spacer spacer
spacer Personnel. Slip construction involves many external resources that require management. The "weakest link" cliche applies here. If there is one person who falls short in their efforts, a trickle-down effect is inevitable.

The matrix of responsibility is complex. The first consideration is always safety. Our safety director is on-site performing pre-slip orientation to all involved as well as safety scrutinization throughout the entire phase policing OSHA compliance. The concrete supplier has people behind the scenes working around the clock batching and delivering product. Slip construction crews have a workforce that involves many people with specific responsibilities varying from concrete buggy/shovel, vibrator, rebar, welders, hydraulic jack, finishers, ground-deck personnel, carpenters, and superintendants. The construction crew can work together as a finely choreographed unit with the right direction. Independant concrete testing services are appropriate. They, too, have non-stop, on-site duties. Lastly, as the design builder, we also staff a quality control group that monitors all facets of slip. The project manager is the liaison among all the players. If there is a void, it is our duty to address and rectify it.
spacer spacer spacer
Lastly, upon completion of the meeting, and once all contact information is confirmed, an organization chart is developed encompassing all pertinent information. This organization chart is the cover of the slip drawing design package that is distributed throughout. A set is also laminated and placed on the slip deck for accessibility. Published material includes contact numbers for local fire/police/ambulance/utilities and all members of the project who have a supervisory or management role. Everyone is required to be available at anytime, or have a contingency plan in place.

As with any project, you get what you put into it. A slip-form project is a unique process that presents many challenges. With pre-planning done correctly, a successful slip is inevitable and truly rewarding.
Grant Kennedy is a Project Manager at WL Port-Land Systems.
Forward To A Friend
EXPERTISE  Arrow
spacer
spacer
spacer
spacer
spacer
spacer
spacer
spacer
spacer
divider
If you haven’t been to our WEB SITE recently, you really should check it out!

We think it’s worth a peek!
divider
SAVE FUEL COSTS!
A solid biomass boiler system can be the solution that provides the fuel cost savings you are looking for.

WL Port-Land Systems, Inc. has teamed with Hurst Boiler & Welding Co. to offer custom-designed biomass boiler systems for your existing or new facilities.

Hurst Boiler has successfully designed hundreds of combustion and steam generation systems to burn various forms of solid biomass. As a team, WL Port-Land and Hurst Boiler will design and build the complete system including fuel storage and handling, piping, and equipment installation.

E-mail or call us -- at 412-344-1408 -- to set up an appointment to meet with you to evaluate your current fuel costs and provide you with a payback schedule.

What do you have to lose?
divider
Did You Know?
divider
spacer
International Code Council
spacer
The major model building codes used in the United States are developed by the International Code Council (ICC) which has 14 sets of international codes
(or i-codes).
spacer
They include the International Building Code (IBC), the International Residential Code, the International Fire Code, the International Energy Conservation Code, the International Plumbing Code, the International Mechanical Code, and others.
divider
Featured Project
Perdue FarmsPerdue Farms
WL Port-Land Systems, Inc. is close to completing a new rail receiving and storage system for Perdue Farms at their Candor, NC feed mill.

The new rail system includes a slip-form concrete receiving building that will allow them to unload 90-car-unit trains.

The new metal silo has a capacity of 500,000 bushels and utilizes an above-grade reclaim tunnel.

For more Recent Project Highlights,
click here.
Forward To A Friend
divider
Please let us know
of any changes
to your contact information.
Address change?
New title?
Update Your Profile
divider
divider
WL Port-Land Report Archive:
divider
Events Calendar
WL Port-Land will participate in all of these industry events.
Click to set up an appointment with a rep.


March 3-6, 2012
GEAPS Exchange 2012
(Grain Elevator & Processing Society)
Minneapolis Convention Center
Minneapolis, Minnesota

May 8-10, 2012
PTXI Powder Bulk Show
Donald E. Stephens Convention Center
Rosemont, Illinois

August 15-17, 2012
Coal-Gen
Kentucky International Convention Center
Louisville, Kentucky

December 11-13, 2012
Power-Gen
Orange County Convention Center
Orlando, Florida
Forward To A Friend
divider
About WL Port-Land Systems, Inc.
  • Our Internet address is www.wlport-land.com.
  • Our general e-mail address is info@wlport-land.com.
  • You can call us at 412-344-1408 or fax us at 412-344-1412.
  • You can "snail mail" us at 305 Mt. Lebanon Blvd., Suite 400, Pittsburgh, PA 15234.
We look forward to hearing from you!
Forward this email tweet Facebook LinkedIn
Remove me from your list.  |  Subscribe.  |   Update your profile.  |  Contact us.
OpenMoves Email that Means Buiness...Try It!